SPECIFICATION FOR THE SUPPLY AND INSTALLATION OF NETWORK
INFRASTRUCTURE:
Installation of six network data points in the following offices:
o Room 2112 (2 points)
Room 2113
o Room 2114
Room 2117
Room 2118
All points to be cabled to first floor network rack
6x 3 meter long fly-lead, in color blue.
6x 1 meter patch lead, in color yellow. All points to be cabled to Molex Cat5e specification
1x Cisco Catalyst 2960X-48FPS-L 48 ports up to 15.4 PoE Power 720W
5 year warranty on the above switch
1 x 24 port Cat 5e Patch Panel
1 x 1U Brush panel
All points to be labelled
No switch configuration required.
Contact Customer