Posted by
Keith N.
When: Next few weeks
Job Description:
1. Carefully as possible remove tiles
2. Move bath +- 20cm
3. Remove existing tap channel and re-route water pipes +-1 metre.
4. Fit an exposed shower set over bath.
5. Fit a bath screen on to the wall.
6. Remove existing basin and cupboard, replace with new basin and cupboard.
7. Connect all plumbing.
8. Plaster and re tile...
Aug 26, 2024